Hiring Team Leaders And Their Deputies To Supervise The Feasibility Study Of Household Connection On Water Supply Systems tender at Water For People (WFP)
Website :
11 Days Ago
Linkedid Twitter Share on facebook

TERMS OF REFERENCE FOR HIRING TEAM LEADERS AND THEIR DEPUTIES TO SUPERVISE THE FEASIBILITY STUDY OF HOUSEHOLD CONNECTION ON WATER SUPPLY SYSTEMS IN RULINDO, GICUMBI, RWAMAGANA, KIREHE, NYABIHU, AND RUBAVUDISTRICTS

1. Background Information

The Government of Rwanda (GoR) is committed to implementing the global agenda of Sustainable Development Goals (SDGs). As reflected in the National Water Supply and Sanitation policies and strategies, the GoR endorsed SDGs that target achieving universal access to safely managed drinking water and sanitation by 2030.

Water For People is an international non-governmental organization (NGO) that works with people and partners to develop innovative and long-lasting solutions to water, sanitation, and hygiene problems in developing countries. The organization strives to improve, experiment with promising new ideas, and leverage resources to multiply its impact.

To achieve its ambitious targets, GoR has adopted the “District Wide Approach” (DWA). This systems-based approach considers the district as the entry point whilst recognizing the broader national enabling environment to achieve universal and sustainable access to WASH (Water, Sanitation, and Hygiene) services.

Water For People collaborated with MININFRA, WASAC, and the districts to conduct detailed engineering designs of water systems to ensure universal access in various districts. The developed studies are helping the districts with planning and resource mobilization to implement WASH infrastructure projects; Water For People is keen to strive for the sustainability of water supply services to ensure that “Forever” is guaranteed. In this framework, Water For People is committed to supporting further Rulindo, Gicumbi, Rwamagana, Kirehe, Nyabihu, and Rubavu Districts to conduct a detailed feasibility study for Household connection on the water supply systems as a boost towards achieving the safely managed water service for all by 2030 and hence citizens will enjoy a smooth service Forever.

Against this background, Water For People—Rwanda would like to hire skilled Engineers to serve as Deputy and Team Leaders to carry out the feasibility study for household connections to the existing water supply infrastructures in the 6 districts.

2. Scope of work

Besides bridging the gap in skills and knowledge required among team members to perform the assigned assignment, the Team Leader and his/her Deputy will coordinate a team of 8 freelance engineers to:

  • Conducta desk review of existing WASH documents (developed studies and as-built files), including asset registry, existing/ongoing projects, current approved population settlement plans, ), to have general information on existing water distribution networks and plans.
  • Ground check all existing water supply infrastructures managed by the piloted Private Operator per district, conduct a thorough analysis component by component from the source to the last point of its coverage, and identify the surrounding settlements with households without a nearby pipeline to connect to for a private connection.
  • Calculate accurately the water demand anticipating that all Households served or to be served by a given water supply system will get private connections, the projection will be for a 25-year horizon.
  • Measure the water sources' yield to confirm if they will satisfy the demand given the household connections anticipated. In case the discharge is insufficient propose an alternative source of water to bridge the gap and design accordingly. (If natural springs are not available to meet the demand, a Water Treatment Plant can be proposed as well).
  • Investigate if the existing pipeline size can carry the required water to serve the household connections, if not design an upgraded system and provide all annexes (profiles, hydraulic calculations, drawings, shapefiles, BoQ, etc). This applies to other system components such as water storage, etc.
  • For each water system whose components (some or all) need to be rehabilitated, quantify and estimate the cost then report it in the form of a BoQ
  • Based on the updated planned settlements, identify and document any area that is not covered by water supply infrastructures and design an extension pipeline to that area to facilitate a household connection. (i.e. the distance from the pipeline to the households should be ideal not more than 50m for easy private connection). Provide the corresponding BoQ.
  • Produce a well-labeled map (with &without ortho-photo) for each water supply system showing the current infrastructure coverage vis à vis the approved planned settlements and proposed pipeline extensions to bring the pipe closer to the Households in the specified distance for private connection. As well as proposed upgrades. (It is required to provide two separate maps, one being the current status with planned settlements, another one being the result of the feasibility study for household connections)
  • Simulation of each upgraded water supply system using EPANET, WaterCAD or WaterGEMS.
  • Produce a clear and concise narrative report.

Expected outputs.

  • Situational analysisreport showing each water supply system compiled at the district level with annexed maps as described in the scope.
  • Upgraded designs for water supply systems including pipeline extensions in the specified distance to accommodate the household connections with all annexes as described in the scope
  • Inventory of proposed alternative water sources per water supply system to bridge the gap as per the current water balance considering the household connections as specified in the scope, with the estimated cost to carry the works to feed that water into the concerned WSS.
  • Detailed Bill of Quantities for each water supply system including upgrading works, pipeline extension to 50m less from the household, and any components to be rehabilitated.
  • Simulation of each WSS as described in the scope
  • Final narrative report.

4. Team composition and profile

The Team Leader and his/her deputy will be part of 10 engineers per district. The following profile will be required to perform this assignment:

  • University Degree (Ao) in Water and Environmental Engineering, Hydraulic Engineering, or Civil
  • Experience in detailed designs of water supply systems with verifiable proof.
  • Having worked in the district of his/her interest, on the activities related to Water Supply Projects with a track record, preferably designing by simulation.
  • Experience with Water For People as a Freelance engineers’ Team Leader or Deputy with a good record is an added value.
  • Being a certified engineer proven by a valid certificate is a must.
  • Computerliteracy: Knowledgeof AutoCAD/COVADIS, GIS ArcView/ArcMap is highly 
  • Skills in Water Supply Systems modeling using either EPANET, WaterCAD, or WaterGEMS (The selection exam will be based on one of these modeling software, be ready!)
  • EnglishandKinyarwanda 
  • Teamworkspirit with the ability to work independently and produce the desired results.
  • Not planning to subcontract in any case.

5. Supervision

  • Thework performed by the selected Engineers will be validated by a technical team composed of representatives of WASAC Ltd, Districts, and Water For People.
  • Freelance Engineers Team Leader and his/her Deputy will submit weekly progress reports showing achievement on each deliverable as stipulated in the Terms of Reference.

6. Reporting

The following reports will be produced and submitted to the technical team:

  • Situational analysis report for all concerned water supply systems
  • Upgraded studies for each WSS to enable private connections in the specified distance

BoQs

  • Maps
  • Inventory of alternative water sources to satisfy household water demand.
  • Simulation of each WSS resulting from this household connection feasibility study.
  • Final report

7. Duration of the assignment

The assignment duration will vary from one district to the other and therefore will be specified in the individual contract.

8. Remuneration for the work performed and other facilitation

The Team Leader will receive a net per-diem of RWF 55,000/day while his/her deputy will get RWF 53,000/day. In addition, the following facilitation will be provided:

  • Group Accident Insurance for the selected Freelance Engineers throughout the assignment
  • Stipend money spent on the field paying plumbers and other local supporting 
  • GPSdevices,meters, buckets to measure the discharge of the sources of each system, and other equipment that will facilitate Freelance Engineers to perform their duties on site when deemed necessary.

9. How to apply

If you are qualified and Water For People interests you, apply with an application letter (specifying your district of interest, one application is valid as Team Leader or the deputy as you will be assigned a position based on your relative performance) along with detailed curriculum vitae (resume), relevant academic documents and required certificates, and contact details of at least three (3) references via the email: rwprocurement@waterforpeople.org . Please submit your application materials in English by Friday, 3rd January 2025. In-person visits or phone calls and late submissions are not allowed!

Job Info
Job Category: Tenders in Rwanda
Job Type: Full-time
Deadline of this Job: Friday, January 03 2025
Duty Station: Kigali
Posted: 19-12-2024
No of Jobs: 1
Start Publishing: 19-12-2024
Stop Publishing (Put date of 2030): 19-12-2071
Apply Now
Notification Board

Join a Focused Community on job search to uncover both advertised and non-advertised jobs that you may not be aware of. A jobs WhatsApp Group Community can ensure that you know the opportunities happening around you and a jobs Facebook Group Community provides an opportunity to discuss with employers who need to fill urgent position. Click the links to join. You can view previously sent Email Alerts here incase you missed them and Subscribe so that you never miss out.

Caution: Never Pay Money in a Recruitment Process.

Some smart scams can trick you into paying for Psychometric Tests.